Epilogue

Catherine W. Zipf

Routledge eBooks · 2020

In 1995, Robert Silman, of Robert Silman Associates, began an investigation into Fallingwater’s structural stability. The continued opening of cracks suggested that Fallingwater was still in active motion. Silman’s research confirmed an original design flaw that needed to be resolved.

To do this, he and a team of consultants installed a system of post-tensioned cables that would support Fallingwater’s cantilevered first floor. This modification has allowed the Western Pennsylvania Conservancy to preserve and care for Fallingwater safely and in perpetuity.

📄 이 논문을 인용한 Paperis 글

이 논문이 근거 목록에 올라 있는 Paperis 글입니다.