Epilogue
Catherine W. Zipf
Routledge eBooks · 2020
In 1995, Robert Silman, of Robert Silman Associates, began an investigation into Fallingwater’s structural stability. The continued opening of cracks suggested that Fallingwater was still in active motion. Silman’s research confirmed an original design flaw that needed to be resolved.
To do this, he and a team of consultants installed a system of post-tensioned cables that would support Fallingwater’s cantilevered first floor. This modification has allowed the Western Pennsylvania Conservancy to preserve and care for Fallingwater safely and in perpetuity.